top of page
  • Writer's pictureSarah

Cheers to Construction Progress

So much progress has been made since August, when we first announced the Healdsburg Bubble Bar was coming to our little town. From City Planning meetings, to demo, framing, and testing paint colors, we're moving swiftly toward our ambitious goal of opening by the end of 2023. We've learned very quickly that this is no small task and it takes a lot of work, as well as an amazing construction team, to make the dream a reality.

Street View of Healdsburg Bubble Bar
Healdsburg Bubble Bar Facade Paint Color Testing

The construction team has been working tirelessly to get the electrical and plumbing installed, then moved on to tackle the framing, before they start to reach the finish line with drywall and cabinetry. We're starting to see the dream come to life in a vibrant shade of blueberry that makes us giddy with excitement about how the interior will reflect a quaint French bistro atmosphere and make our guests feel like they've found a little piece of France, right here in the heart of Healdsburg.


We hope you are as inspired as we are by this peek at our progress and the strides we've made so far. Of course, we've got some time to go and lots of finishing touches to iron out (including getting a second coat of paint on the facade so it doesn't look like two shades of blue) before we can swing open the door and invite you all in.

Framing the Interior Space
Healdsburg Bubble Bar Interior Construction

Peg Melnik of the Press Democrat recently stopped by and got the inside scoop for readers about the project and our story. You can check out the full story here.


Press Democrat Article Photo
Sarah Quider, Owner

Can't wait to greet you all with a glass of bubbles soon!

- Sarah and Sam




70 views0 comments

Recent Posts

See All
bottom of page